Installation guide
Construction notes, installation details and drawings for the NXGN hoarding system.
Hoardings are temporary walls used to separate building or fit-out work from surrounding public areas. In shops and shopping centres, they define the work area and provide a continuous face along the public side of a project.
The NXGN system uses timber framing, sheet materials, steel uprights and weight blocks to form freestanding hoardings. This guide covers two ways of building the wall: prefabricated panel hoardings and practical hoardings assembled on site.
Installation manuals
Choose the manual that matches how the hoarding will be built. The upright and load-rating reference covers the supporting components used with both methods.
-
Panel hoardings
Panels are framed and skinned before installation, then joined along the hoarding line. This manual covers construction notes, panel installation, door heads, hanging doors, upright fixing, braces and returns.
-
Practical hoardings
The timber framing and sheet material are assembled on site. This manual follows the construction details for upright fixing, doorways, frames, skin fixing, returns and splays.
-
Uprights and load ratings
Drawings for the steel uprights and weight blocks that support the hoarding. This reference covers upright fabrication, fixing and setout details, offset uprights, load ratings and weight-block installation.
Parts you will see in the drawings
The hoarding face is the surface that encloses the work area. A skin is the MDF or plywood sheet fixed to the timber frame, while studs are the vertical timber members behind it. Panel hoardings combine these into prefabricated units; practical hoardings bring them together on site.
Uprights are steel brackets fixed to the timber studs. Weight blocks sit on the upright feet and provide ballast for the freestanding arrangement. The upright drawings identify these components and show their fabrication and fixing details.
Doorways provide access through the hoarding. Returns and splays deal with changes in direction along its line. Each construction manual includes these details alongside the main wall assembly.
Reading the manuals
Start with the construction notes for your hoarding type, then follow the installation details in order. Read each drawing together with its accompanying text: the labels, dimensions and fixing references connect the illustrated parts to the written instructions.
Use the contents at the top of a manual to jump to a particular detail. Select a drawing to enlarge it and inspect its labels. For a quick lookup, the article index below also opens individual topics such as hanging doors, upright fixing or returns.
All reference articles (24)
Article index 24 articles
Panel hoardings 7 articles
Doors and openings 1 article
Installation details 1 article
Practical hoardings 8 articles
- NXGN Structural Drawings & Installation Of Practical Hoardings
- NXGN Practical Hoarding Detail
- Practical Hoardings - Upright Fixing Detail
- Practical Hoardings - Doorways
- Practical Hoardings - Doorway Frame
- Practical Hoardings - Skin Fixing Specification
- Practical Hoardings - Returns
- Practical Hoardings - Splays