Next Generation Hoardings

Next Generation Hoardings

  • Home
  • About
    • Open Hoarding System
    • Sustainability
    • Hoarding certification
  • Services
    • Shopping Centre Hoardings
    • Hoarding Component Hire
  • Contact
    • Request For Quote
    • General Enquiry
  • Tools
    • Hoarding Planner
    • Weight Block Calculator
    • Scope Creator
  • Knowledge Base

  • System basics
    • Panel vs Practical
    • Panels vs skins
  • Installation guide
    • Panel hoardings
      • Panel hoardings overview
      • Typical hoarding detail
      • Panel installation detail
      • Panel construction
      • Upright fixing
      • Corner braces
      • Returns
    • Doors and openings
      • Hanging doors
    • Installation details
      • Hoardings without returns
    • Practical hoardings
      • Practical hoardings overview
      • Typical practical hoarding detail
      • Upright fixing
      • Doorways
      • Doorway frame
      • Skin fixing specification
      • Returns
      • Splays
    • Uprights and load ratings
      • Upright drawings and load ratings
      • Upright overview
      • Welding and material specification
      • Fabrication setouts
      • Load ratings and weight blocks
      • Offset uprights
      • Counterweights
  • Project guides
    • Planning and installation
      • Retail hoarding installation
    • System interfaces
      • Temporary fencing integration
Installation Guide
Next Generation Hoardings Next Generation Hoardings
Installation Guide
Panel Hoardings Practical Hoardings (skins) Uprights & Load Ratings
  1. Installation guide

Practical Hoardings - Returns

Practical Hoarding Returns

Previous Practical Hoardings - Skin Fixing Specification Next Practical Hoardings - Splays
Practical Hoarding Returns

Return Panels (Returns) are typically at each end of a hoarding returning the hoarding back into the shop-front or construction site.

To install Returns on Practical Hoardings:

  1. install an Additional Stud (see: Skin Fixing Specification) on the edge of the Panel Skin (SK) you wish to return.
  2. Fix Panel Skin (SK) to Additional Stud (see: Skin Fixing Specification)
  3. Install Offset Upright (see Offset Uprights).
Collection
Installation guide
Category
Practical hoardings
Article
1 section
Source
Next Generation Hoardings MediaWiki

Image preview

Technical image

Use arrow keys or swipe to move between images.

Open original reference ↗
Next Generation Hoardings Logo

Open hardware. Connected workflow.

NXGN's open retail hoarding system lets contractors and owners fabricate their own hoardings, mark up plans, calculate materials and job prices, and install hoardings without proprietary lock-in. Our platform keeps customer details, plans, quotes and installation records together, so you can organise each job from enquiry to completion.

Open System

Installation Guide Panel vs Practical Load Ratings Counterweights

Platform

Hoarding Planner Scope Creator Weight Calculator

Work With NXGN

Shopping Centres Component Hire About NXGN Contact
Contact Us Today hoardings@nxgn.au
0477123901 Contact Us Today
© 2026 Next Generation Hoardings Pty Ltd.
Built by Vortex