Panel Installation Detail
Image outlines the panel fixing specifications on-site:
- Panels are fixed to one another using 65mm 10G Chipboard Screws through Top, Middle & Bottom Studs.
- Uprights are fixed to the Hoarding Panel Studs Top & Bottom Stud Upright Receiver with 65mm 10G Chipboard Screws
Splay Panel Installation Detail
- Splay Panels are intended to change the direction of the hoarding and provide a flush corner finish on the hoarding face.
- Splay Panels when installed on-site are screwed through the skin overhang into the other Hoarding Panel Stud Top, Middle & Bottom.