Next Generation Hoardings

Next Generation Hoardings

  • Home
  • About
    • Open Hoarding System
    • Sustainability
    • Hoarding certification
  • Services
    • Shopping Centre Hoardings
    • Hoarding Component Hire
  • Contact
    • Request For Quote
    • General Enquiry
  • Tools
    • Hoarding Planner
    • Weight Block Calculator
    • Scope Creator
  • Knowledge Base

  • System basics
    • Panel vs Practical
    • Panels vs skins
  • Installation guide
    • Panel hoardings
      • Panel hoardings overview
      • Typical hoarding detail
      • Panel installation detail
      • Panel construction
      • Upright fixing
      • Corner braces
      • Returns
    • Doors and openings
      • Hanging doors
    • Installation details
      • Hoardings without returns
    • Practical hoardings
      • Practical hoardings overview
      • Typical practical hoarding detail
      • Upright fixing
      • Doorways
      • Doorway frame
      • Skin fixing specification
      • Returns
      • Splays
    • Uprights and load ratings
      • Upright drawings and load ratings
      • Upright overview
      • Welding and material specification
      • Fabrication setouts
      • Load ratings and weight blocks
      • Offset uprights
      • Counterweights
  • Project guides
    • Planning and installation
      • Retail hoarding installation
    • System interfaces
      • Temporary fencing integration
Installation Guide
Next Generation Hoardings Next Generation Hoardings
Installation Guide
Panel Hoardings Practical Hoardings (skins) Uprights & Load Ratings
NXGN freestanding hoarding system installed in a retail environment

NXGN / Open hoarding system

Fabricate your own hoardings.

Contractors and owners can use the NXGN drawings and installation guide for free. Choose your suppliers and have your own installers build to the guide.

  • Make your own Fabricate uprights and prepare timber panels or sheet skins.
  • Choose your suppliers Buy materials and suitable counterweights where you choose.
  • Reuse between jobs Remove, inspect and store suitable equipment for the next job.
View the installation guide View timber panel drawings
How to get started ↓
OPEN

01 / Free drawings and guidance

Your suppliers. Your installers.

Use your workshop to prepare hoardings, or have your preferred fabricator make the uprights. Contractors and owners can access the drawings without a proprietary installation licence fee or an exclusive installer network.

  • Drawings and guidance: Read the material specifications, fabrication drawings and installation details for free.
  • Your installation team: Use competent installers who can follow the guide and meet the requirements of the job.
View the installation guide →
DoorMeasure → plan → prepare

02 / Prepare your plan and materials

Plan for your next job.

Measure the site, choose the hoarding height and mark doors, corners and changes in direction. Choose timber panels for quick assembly or sheet skins when compact storage matters more.

The paid NXGN app lets you draw a plan in 2D, review it in 3D and calculate how many panels, uprights, counterweights and doors you need.

  • Check access, unloading space and the time available to install.
  • Allow room behind the hoardings for uprights and counterweights.
  • Prepare the plan, materials and matching installation guide before arriving on site.
Compare the construction methods Explore the NXGN app

03 / Build your upright inventory

Add uprights as your business grows.

Your choice of fabricator

Choose who makes your uprights

Have NXGN uprights made in your own workshop or by your preferred steel fabricator. The published drawings are free to use, so you can choose who makes them and where you buy.

Your own equipment

Build up the stock you need

Hoarding contractors who install regularly can add uprights as more work comes in. Grow your NXGN inventory alongside the equipment you already own.

Your next installation

Reuse between jobs

For shopfitters and small contractors who install occasionally, suitable uprights can be stored after removal and reused on the next job. Keep the equipment you have invested in ready for another installation.

View the upright drawings Talk to NXGN

04 / Timber panels for regular installations

Prepare off-site. Assemble quickly.

Timber panels suit hoarding contractors who install regularly and have workshop and storage space. Prepare the timber frames and MDF or plywood skins off-site so your installers arrive with panels ready to assemble.

  • Build panels to the sizes, materials and fixing details in the drawings.
  • Prepare door heads, corners and skirting to suit the plan, and allow for panel transport and handling.
  • Remove and inspect the panels after each job. Repair where needed, then store suitable panels ready to reinstall.
View timber panel drawings View the panel installation manual

05 / Sheet skins for occasional installations

Less bulk to store between jobs.

MDF, melamine or plywood skins suit shopfitters and small contractors who install occasionally. Store and transport the sheets and timber studs separately, then assemble the hoardings on site using the practical hoarding guide.

  • Keep sheet skins and studs in compact storage between jobs.
  • Allow space and time on site for storage, cutting and assembly.
  • Follow the specified sheet thicknesses, upright positions, doorway frames and fixing details.
View the sheet skin construction guide View sheet skin fixing details

06 / Source your counterweights

Source locally. Reuse between jobs.

NXGN uses compatible standard temporary fencing counterweights. Check the counterweights in your existing equipment first, then hire or buy any extras from your preferred supplier.

  • Check the counterweight type, mass and fit against the documented arrangement.
  • Use the load-rating details to work out how many counterweights the job needs.
  • Remove, inspect and store suitable counterweights for reuse on your next job.
Read about NXGN counterweights View load ratings and counterweights

07 / Plan and install

Give your installers the plan and guide.

Have competent installers follow the manual for your chosen construction method. Give them the site measurements, plan and materials list before work starts.

The NXGN system is pre-engineered and certified to AS 4687 for its documented configurations. Follow the specified construction details and design criteria for your installation.

  1. Measure Lengths and heights
  2. Prepare Plan and materials
  3. Install Uprights and panels or skins
  4. Fit Doors and skirting
  5. Check Counterweights and fixings
  6. Remove Inspect and repair
  7. Store Ready for the next job
View panel installation details View door installation details View return and corner details

Free drawings / Your suppliers / Your installers

Prepare for your next installation.

View the installation guide Contact NXGN
Next Generation Hoardings Logo

Open hardware. Connected workflow.

NXGN's open retail hoarding system lets contractors and owners fabricate their own hoardings, mark up plans, calculate materials and job prices, and install hoardings without proprietary lock-in. Our platform keeps customer details, plans, quotes and installation records together, so you can organise each job from enquiry to completion.

Open System

Installation Guide Panel vs Practical Load Ratings Counterweights

Platform

Hoarding Planner Scope Creator Weight Calculator

Work With NXGN

Shopping Centres Component Hire About NXGN Contact
Contact Us Today hoardings@nxgn.au
0477123901 Contact Us Today
© 2026 Next Generation Hoardings Pty Ltd.
Built by Vortex